Plant controller vs EMS vs SCADA
Assign control, scheduling and operator-visibility duties clearly. Read the role guide →
Access concise EMS hardware, HMI and software briefs, plus anonymised microgrid and hybrid-energy application cases. Enter your contact details below to download.
Selecting between an all-in-one site EMS and tiered grid-connected control? Request the project-specific architecture, equipment schedule and compliance evidence needed for your application. Need an interface or mounting drawing? Contact [email protected].
Your details are recorded in the Control Link CRM to provide these resources and respond to your enquiry. Submitting this form does not subscribe you to SMS marketing.
Practical questions to resolve before a tender, demonstration or configuration review. These notes guide evaluation; they are not product certification or project design.
Assign control, scheduling and operator-visibility duties clearly. Read the role guide →
Define interfaces, limits, operating modes and evidence before comparing offers. Read the specification checklist →
Ask for maintainable configurations, agreed data access and a recovery plan. Read the ownership checklist →
These functions can share hardware or be distributed. Name each responsibility in the architecture rather than assuming a product label tells you where it lives.
Coordinates commands and equipment limits at the relevant level. Identify the systems responsible for real-time behaviour and independent protection.
Uses operating priorities, available energy and configured constraints to inform schedules and coordination. Identify which schedules can become commands and how they are validated.
Provides the operator view, alarms, trends and configured control interfaces. Define permissions, command acknowledgement and the required operational history.
Evaluation question: If the cloud link, station server or an equipment connection fails, which functions continue locally, which stop, and how is the operator informed?
Use this checklist to define a demonstration and acceptance-test scope.
For grid-connected plants, the connection requirements, studies and approval process apply to the complete installation.
Turn ownership principles into concrete deliverables.
For further OT security background, see NIST’s Guide to Operational Technology Security →. This is independent guidance, not a Control Link certification.
Bring your equipment list, operating priorities and interface requirements. We will help identify the right product configuration and the evidence to evaluate it.